Hi Bidwan,
Should be possible, as long as the SP level of BPC is the same.
once that is done, then remember to run migration to HANA program.
Andy
Hi Bidwan,
Should be possible, as long as the SP level of BPC is the same.
once that is done, then remember to run migration to HANA program.
Andy